An experimental station layout
In natural light where there should not be parallel to the exterior lighting window , because when people are facing window glare, but back when , countertops produce shadows.
A. Set Island Central bench should consider the processing pipeline , several cases are listed below :
( A ) stamped on the floor digging trench plate , there is a leak , effusion , but ease of maintenance ;
( 2 ) Floor buried , when problems arise , you need to open up the repair and replacement , affecting around ;
( 3 ) there is leakage problem wearing floor , downstairs high-precision instruments should not be set too high maintenance inconvenience ;
( 4 ) suspended , too ugly , affect the appearance.
B. Recommendations set peninsula central station ( Island lab bench ) , the advantage is easy to buried pipelines .
C. The required spacing between the bench :
Two experimental platform scale requirements
( A ) The length of bench assignment: general laboratory 1.2 meters / person ; Organic Laboratory 1.5 m / person
( 2 ) Table height: Chinese 850mm; United States, West Germany, 900 ~ 920mm; Japan 800mm
( 3 ) Table width : ≥ 600mm, try not to exceed 750mm ( sheet maximum utilization )
( 4 ) two-sided table that Island bench : 1500mm
Three experimental stations combined
( A ) laboratory bench tops as far as possible the whole piece countertops, standard cabinet portfolio to reduce countertops patchwork ensure bench overall appearance, convenient debugging and improve the construction schedule .
( 2 ) extensor notch width : 600 ~ 1100mm
( 3 ) Reagent rack : Two bottles of medium depth can be juxtaposed reagent bottle (500ml) is appropriate. Usually 200 ~ 300mm, upper and lower layers ;
( 4 ) by the wall abutment with the reagent rack to take : 200mm
( 5 ) to take central stage with reagent rack : 300mm
Four for special laboratory planning requirements
( A ) Spectrum Room :
With sample treatments : There are sinks , bench , fume hoods , etc. ;
Instrument room ( spectrographic room ) : room temperature 20 ± 5 ℃, humidity of 65 ± 5%;
Ventilation: the upper part of the instrument should inspire local exhaust hood devices.
( 2 ) mass spectrometry Room :
With sample treatments : There are sinks , bench , fume hoods , etc. ;
Instrument room : room temperature 20 ± 5 ℃, humidity 60% to 65% ;
Ventilation: mass spectrometer with mercury vapor to escape , interior needs local ventilation , local exhaust hood above the instrument must devices.
Water supply: water pressure of not less than 2Kg/Cm2.
Power supply: single-phase three-wire required 110VAC, 220VAC and 380VAC three-phase five-wire power .
( 3 ) Optical diffraction analysis instrument rooms :
With sample treatments : There are sinks , bench , fume hoods , etc. ;
Instrument room : room temperature 20 ± 5 ℃, humidity of 65 ± 5%; thickness sufficient protection , protective door signaling device must be turned off , to have good ventilation , need to have : a vacuum , compressed air, cooling water supply .
( 4 ) chromatographic analysis room :
With cylinders Storage :
Instrument room : room temperature 20 ± 5 ℃, humidity of 65 ± 5%; chromatography instruments have a solid platform , the instrument sets the distance from the wall should be 600mm, in order to repair the instrument , the instrument should have local exhaust hood above the device .
( 5 ) Atomic Absorption Room :
With sample treatments : There are sinks , bench , medicine cabinets , fume hoods , etc. ;
Easy and liquid chromatography , gas chromatography in the same room.
Temperature 22 ~ 27 ℃, humidity 65 ± 5%; have a solid platform chromatography instruments , apparatus, Taiwan should the distance from the wall 600mm, in order to repair the instrument .
Gas : gas lines generally have three kinds : nitrous oxide , acetylene gas , compressed air, gas cylinder storage room into the interior route , total indoor pipeline through the regulator valve points to each chromatograph, connecting each chromatogram Miriam front of the needle valve . Air compressor pump gas available to help .
Ventilation: atomic absorption with combustible gases, carbon dioxide released by burning , have good indoor ventilation, local exhaust instrument should cover the top of the device .
Power supply: single-phase three-wire required 110VAC, 220VAC and 380VAC three-phase five-wire power .
( 7 ) Liquid Chromatography room :
With sample treatments : There are sinks , bench , medicine cabinets , fume hoods , etc. ;
Easy and atomic absorption , gas chromatography in the same room.
Temperature 22 ~ 27 ℃, humidity 65 ± 5%; have a solid platform chromatography instruments , apparatus, Taiwan should the distance from the wall 600mm, in order to repair the instrument .
Ventilation: liquid chromatography with organic gases , have good indoor ventilation , the top of the instrument have local exhaust hood devices.
Power supply: single-phase three-wire required 110VAC, 220VAC and 380VAC three-phase five-wire power .
( 8 ) Gas chromatography Room :
With sample treatments : There are sinks , bench , medicine cabinets , fume hoods , etc. ; easy and liquid chromatography , gas chromatography in the same room. Temperature 22 ~ 27 ℃, humidity 65 ± 5%; have a solid platform chromatography instruments , apparatus, Taiwan should the distance from the wall 600mm, in order to repair the instrument .
Gas : gas lines are generally equipped with four kinds : nitrogen, hydrogen , helium , compressed air, gas cylinder storage room into the interior route , the road to increase the gas filter into the interior through the total pipeline regulator valve points to each a chromatograph , connecting each chromatograph front needle valve . Gas can be used to help air compressor pump , hydrogen hydrogen generator available . TCD detector exhaust pipe connected to the outdoor use .
Ventilation: chromatographic chamber with hydrogen and carbon dioxide released by burning , have good indoor ventilation.
Power supply: single-phase three-wire required 110VAC, 220VAC and 380VAC three-phase five-wire power .
( 9 ) balance room :
Balance is an essential common chemical laboratory equipment.
Precision scales have certain requirements on the environment : vibration , dust, direct sunlight , corrosive gases and has a constant temperature of erosion , it set up special balance room to meet the above requirements .
North to the appropriate balance room , but also away from the vibration source , not with the high temperature chamber and strong electromagnetic interference adjacent room . The high-precision microbalance should be located on the ground floor .
To balance room with double windows, insulation dust conducive to the balance chamber is preferably provided with a transition between the entry to be protected from the impact of airflow , air conditioning , wind speed should be small .
Scale indoor basin or may not set any pipe through indoor , avoid leaking pipes , condensation or in the pipeline overhaul of the use and maintenance of the balance .
Try not to put unnecessary furniture to reduce dust.
Other environmental factors that impact on the balance : people walking, door switches.
Low environmental impact on the largest scales .
The installation can not be close to the wall , from the wall to be 20mm ~ 50mm, to prevent from the vibration .
Five laboratory ventilation piping planning and measurement requirements
Draw a line chart
Customers planning and design in the same ventilation system , be sure to get the engineering related field measurement data , laboratory equipment Co., Ltd. Shanghai Yu Shan under the general planning scheme , summed up the general planning steps required : Laboratory plane size of the room , which floors, floor headroom height of the room and the floor beams , ceiling and floor height , ventilation products in the size of the room layout position , the position of the wall the size of the windows , the roof in which the floor , fans sited on rooftops size , customer requirements towards the exhaust pipe , exhaust well -sectional size.