How to install laboratory furniture
 Lab furniture installation and testing requirements

( A ) , bench requirements

1 , bench installation requirements

An experimental base cabinet floor model tables :

a) by the end of each unit placed upright cabinet position by the icon and adjust the level of the bottom of each unit in the same horizontal position counter link , such as a separate unit base cabinet should also be properly fixed to the laboratory floor.

b) Install accessories , and note various public system piping must not have any winding or tangle .

c) If necessary, each unit will be done in close connection with the same level , adjoining drawer and door pieces are in the same line .

d) The adjustment of the base cabinet door drawer with smooth switch, without any obstruction or loss of normal function.

Two experimental table tops :

a) site construction : When Taiwan panel seams shall be bonding the construction site , its bonding process should be the same way with the factory , you must use the special adhesive specified by the manufacturer , as well as the required fixture manufacturers and construction methods to do connection , the Taiwan panel 's most cutting, rounding and processing should be ended ditches processing is completed in the factory , not on site processing . .

b) the installation of the adjacent table should be in the same horizontal plane , the edge should be cut flush , you must provide appropriate support means to prevent Taiwan panel due to lack of support force caused collapse threshold . Bonding Taiwan panel, the gap junction shall not exceed 3.175mm (1/8 "), and should remain flat.

c) After completion of installation work must be carefully cleared of debris on the table and do the cleaning and maintenance of oil a dedicated maintenance work .

d) For tanks and utility systems necessary accessories to provide the correct position and size of the openings .

3 Sink:

a) adopt counter basin installation method

b) installation countertop with sink size 30mm length and width of narrow openings , opening on the edge of the table to be taken 4? 6mm

R corner rounding arc treatment .

c) should be installed in steel sink suspension bracket ( ceiling mounted bracket may not be placed directly on the cabinet bottom plate bracket upside support , so the storage space occupied under ) support from the bottom up to supporting and engaging the bottom of the table , and its strength steel brackets need to be able to support the weight of the tank full of water without sagging deformation, the upper edge of the table at the bottom of the sink flush with the countertop seams neutral Dow Corning silicone mold filling , in order to achieve one and leak-proof effect.

d) all tanks should be equipped with anti- siphon bottle collector.

4 All experiments Zhuodi cabinets full of the unit should be independent , so double-door cabinet needs to open design , shall not be set so as not to affect the intermediate support pillar article access , floor -type base cabinets must be attached with steel adjustable foot , base cabinets lower edge of the height from the ground should be greater than 10mm.

5 All steel cabinet and frame are subject to a good and complete acid EPOXY powder paint treatment processes , finished paint film thickness of 75μm and above average .

6 experimental table each unit 's door base cabinet and drawers should be easy to switch chip , without any hindrance.

7 Check the adjacent base cabinet the same type and height of the doors and drawers should be on the same line and is not caused by poor processing level due to uneven gap where the line should be 3.175mm (1/8 ") inside .

8 Check that all external openings bench , on which holes are applying appropriate stoppered .

9 Verify that all laboratory tables with epoxy resin countertops are rather special silicone adhesive bonding , for the sake of aesthetics files back and countertop water use silicone bonding . The width of the gap junction not exceed 3.175mm (1/8 "), after bonding should be flat and can not countertop level of missing .

10 experimental table Taiwan panel should try to maintain its integrity , should minimize the engagement , you can not pick and portrait mode .

11 Check the experimental table sets beneath the edges of the outer side panel if there is only ditch, ditch ended processing methods instead of concave bulge type, only gutter width should be no less than 2mm, the depth of not less than 3mm.

12 Check the water, electricity , gas and duct location and connection, check whether the design of a deviation , timely feedback to the project manager, the project manager and the owner or other contractors to communicate, to determine the final solution.

13 would be arranged in accordance with the drawings base cabinet , all the same bench cabinet at its mounting location along the bottom of the cabinet at the same level tone ( absolute prohibition in the case of no adjustment levels plus skids tablets and other items ) . After adjusting the level of required base cabinet and base cabinet gap distance of no more than 1mm, the upper and lower seams error does not exceed 0.5mm. If you need all of the base cabinets fused level must be adjusted after the end connection, the connection must be requested at the seams tight uniform distance between the seam does not exceed 0.7mm, the upper and lower seams error size can not exceed 0.5mm.

14 cabinet finish level after adjusting for pipeline installation

15 pipe installation is complete, the table placed in the bottom cabinet , countertop and countertop seams distance should not exceed 2mm, joints two distance error size can not exceed 0.5mm, check whether the bending table , if the table is slightly deformed, in gap by adding rubber gasket to ensure a solid countertop installation . Countertop installation, if the table has a protective film , you must install After acceptance, before removing the protective film.

16 If a person must work step counter tops, countertops and furniture protection must be prepared to work .

17 . Dual-port gooseneck faucet hot and cold water test : the use of European and American imports Vertical dual-port copper gooseneck faucet test surface by acid EPOXY powder coating process. Outlet 2 , the top one ( hot and cold water mixing exports ) can be rotated 360 ° , below a ( cold ) is fixed, two or so from 220mm ( included ) or more, and have a detachable high compression outlet port to facilitate convergence hose ;

18 . Dual-port gas Hancock : The European and American imports of copper vertical 180 ° dual-port gas Hancock , EPOXY powder paint surface by acid treatment . Button spool valve using bombs and a beak -type hose nozzle to facilitate convergence .

19 . Precision gas valve : The use of stainless steel imported from Europe dual-port gas ball valve interfaces, outlet diameter 1/ 8 " , and have the gauge head .

20. Function column installation

a, floor- function column in the base cabinet installation before the installation. Required for installation of the individual functions together tightly with the screw column , a column is the joint between the column and the function of the distance can not exceed 1mm, to ensure uniformity of the seam . If a column is installed against the wall , according to the different wall materials , needed functions corresponding column fixation screws to the wall .

b, countertops Function column installation and function must be between the columns in the table padded PP plate . Single column and a column is the distance between the joints must not exceed 1mm, to ensure uniformity of the seam . If a column is installed against the wall , according to the different wall materials , needed functions corresponding column fixation screws to the wall .